Cost to build a G+2 school in Addis Ababa

An example G+2 school with 500 m² on each floor, 1,500 m² in total. Change any detail in the free estimator to match your own building.

Finish levelEstimated total (ETB)Per m² (ETB)
EconomicLocal materials and plain finishes95,000,00063,304
Semi-luxuryGood local and imported mix111,000,00073,914
LuxuryImported, high-end finishes131,000,00087,572

Where the money goes

At the semi-luxury finish level, before overhead, profit, contingency and VAT.

BillAmount (ETB)Share
Substructure & earthworks5,762,6856.6%
Reinforced concrete superstructure23,168,02326.4%
Masonry, walling & roofing works9,228,91610.5%
Carpentry, joinery & openings16,183,66018.5%
Finishing & painting works19,867,39422.7%
Mechanical, plumbing & sanitary installations5,112,5955.8%
Electrical & telecommunication installations5,034,8155.7%
Exterior works, perimeter wall & drainage3,287,1953.8%

About these figures

  • Rates are based on the Addis Ababa construction market, updated in Sep 2026.
  • Totals include overhead, profit, contingency and VAT at typical values. Quantities use typical proportions for this type of building, so this is for early budgeting, not a quotation.
  • Not included: land, design and permit fees, finance costs, furniture and equipment, and unusual ground conditions.