An example warehouse with 1,000 m² on each floor, 1,000 m² in total. Change any detail in the free estimator to match your own building.
| Finish level | Estimated total (ETB) | Per m² (ETB) |
|---|---|---|
| EconomicLocal materials and plain finishes | 87,800,000 | 87,804 |
| Semi-luxuryGood local and imported mix | 98,600,000 | 98,612 |
| LuxuryImported, high-end finishes | 112,000,000 | 112,048 |
Where the money goes
At the semi-luxury finish level, before overhead, profit, contingency and VAT.
| Bill | Amount (ETB) | Share |
|---|---|---|
| Substructure & earthworks | 8,896,259 | 11.4% |
| Reinforced concrete superstructure | 10,073,349 | 12.9% |
| Masonry, walling & roofing works | 23,186,192 | 29.7% |
| Carpentry, joinery & openings | 12,541,359 | 16.1% |
| Finishing & painting works | 11,650,239 | 14.9% |
| Mechanical, plumbing & sanitary installations | 3,335,141 | 4.3% |
| Electrical & telecommunication installations | 3,365,904 | 4.3% |
| Exterior works, perimeter wall & drainage | 4,905,670 | 6.3% |
About these figures
- Rates are based on the Addis Ababa construction market, updated in Sep 2026.
- Totals include overhead, profit, contingency and VAT at typical values. Quantities use typical proportions for this type of building, so this is for early budgeting, not a quotation.
- Not included: land, design and permit fees, finance costs, furniture and equipment, and unusual ground conditions.